Pricing
Status historyRSS updatesStatus API

Powered by Uptimus

    Histórico de interrupções do Axway

    13 Axway incidents · Here 2019 — official updates, affected components, duration and resolution details.

    Voltar ao status atual

    Problemas de Login do Axway

    Início 18 Eost 2026 da 19:40 UTC · 25m

    OutageCritical incident
    Componentes afetados
    Amplify MarketplaceAxway Documentation PortalAxway Support PortalPlatform DashboardPlatform DashboardPlatform AnalyticsPlatform DashboardAmplify MarketplaceAmplify EngageAmplify MarketplaceAxway UniversityAmplify EngageAmplify EngagePlatform AnalyticsAxway RepositoryPlatform AnalyticsAxway Community PortalPlatform AnalyticsAmplify EngageAmplify Marketplace
    1. 18 Eost 2026 da 20:05 UTCinvestigating

      Observamos um breve período de serviço de autenticação degradado a partir de 19:40 UTC em 18 de agosto de 2026, durante o qual vários usuários podem ter experimentado falhas de login. Estamos a investigar o assunto.

    2. 18 Eost 2026 da 21:54 UTCresolved

      Este incidente foi resolvido.

    Traduzido automaticamente da atualização oficial do incidente.

    Axway Platform Intermittent Login Issues

    Início 11 Eost 2026 da 05:50 UTC · 1h 0m

    IssuesMinor incident
    1. 11 Eost 2026 da 12:02 UTCresolved

      We observed a brief period of degraded authentication service between 05:50 UTC and 06:50 UTC on 11 August 2026, during which a small number of users may have experienced login failures. The issue has been fully resolved, and services are operating normally. Additional monitoring and preventive measures have been put in place to help maintain service reliability. We regret any disruption this may have caused and appreciate your continued trust.

    Axway Platform Analytics intermittent query failure

    Início 11 Mae 2026 da 14:00 UTC · 0m

    IssuesMinor incident
    1. 11 Mae 2026 da 16:19 UTCresolved

      Unbounded queries overwhelmed the analytics systems in use by Engage and Platform, causing delays in processing between 2PM-3PM UTC today. We will be working to improve query size and performance as well as introduce further restrictions to prevent this from causing issues in the future.

    Axway Platform Outage

    Início 19 Cʼhwevrer 2026 da 13:00 UTC · 0m

    OutageMajor incident
    1. 19 Cʼhwevrer 2026 da 17:28 UTCresolved

      We’re sorry — between 13:00 UTC and 14:00 UTC today some customers experienced partial interruptions to Axway Platform, Axway Analytics, Amplify Marketplace, and Amplify Engage. During that window an internal service error caused elevated failures and automated retries, which temporarily prevented normal access for some users. We restored access by allowing queued requests to proceed while we validated and deployed a tested fix; normal service was confirmed at 14:00 UTC. No customer data was exposed. We’re taking steps to reduce the chance of this happening again, including additional safeguards, improved test coverage, and broader alerting so production issues are surfaced to our public status page and support teams more quickly. If you’re still seeing problems or need help, please contact support through your usual channels.

    Amplify Studio outage - US & EU

    Início 9 Kerzu 2025 da 06:30 UTC · 0m

    Pending
    1. 12 Kerzu 2025 da 10:13 UTCresolved

      Description: During the detected outage on Amplify Studio, users experienced instability in activating integrations. Additionally, the receipt of monitoring data from Fusion was affected. Root Cause: The introduction of additional monitoring checks in the environments led to a permissions error on the clusters. This error disrupted connectivity between the Studio and Fusion instances. The standard validation routines prior to being deployed in production didn’t catch this permission mismatch. Corrective Action: The permissions were promptly reverted, and impacted services were verified. To prevent recurrence, we have implemented additional checks to ensure such changes do not affect production without being detected in lower environments first.

    Amplify Engage - Event Processing Outage in EU Production Environment

    Início 7 Mae 2025 da 16:42 UTC · 4h 33m

    OutageMajor incident
    Componentes afetados
    Amplify Engage
    1. 7 Mae 2025 da 16:42 UTCinvestigating

      We are currently experiencing a major disruption in our EU production environment where event processing has stopped for the majority of services. This issue is impacting several critical functions, including but not limited to: - Product and asset releases (publish/unpublish) - Credential and access request processing - Subscription management - Agent and webhook event delivery Our engineering team is actively working to resolve the invalid event entries to resume normal processing. Once the blockers are cleared, queued and new events will begin processing as expected.

    2. 7 Mae 2025 da 16:43 UTCinvestigating

      We are continuing to investigate this issue.

    3. 7 Mae 2025 da 20:43 UTCidentified

      The issue has been identified and a fix is being implemented.

    4. 7 Mae 2025 da 21:14 UTCresolved

      This incident has been resolved.

    Amplify Fusion EU - Outage

    Início 21 Cʼhwevrer 2025 da 07:00 UTC · 0m

    Pending
    1. 25 Cʼhwevrer 2025 da 09:10 UTCresolved

      Date: Start Friday 21st - 08:02 AM End Friday 21st - 12:23 PM Impact: The Shared Data Plane experienced an outage, resulting in the interruption of transaction processing. Details: During the startup of new worker nodes two issues were discovered. The startup of the CNI plugin failed and was therefore not initialized. A CNI plugin is required to implement the Kubernetes network model. The second issue was due to the EFS plugin crashing with OOM. EFS is used for persistent storage. To resolve the issue, the memory was increased and unstable nodes were restarted. After these actions the Shared Data Plane returned to a stable state and the outage ended.

    Amplify Fusion EU and US - Outage

    Início 5 Cʼhwevrer 2025 da 21:00 UTC · 0m

    Pending
    1. 11 Cʼhwevrer 2025 da 16:13 UTCresolved

      Date: February 5-6, 2024 (Start time after 22:00 UTC on February 5th; end time 09:20 UTC on February 6th) Impact: The Shared Data Plane experienced an outage, resulting in the interruption of transaction processing. Description: A thorough investigation of system logs revealed a disruption in network connectivity between nodes within the Hazelcast cluster. Hazelcast serves as the messaging layer between various components in our Orchestrator. The network disruption prevented communication between these critical components, halting message processing and consequently, transaction processing. Corrective Actions & Future Plans: A root cause analysis is underway to determine the specific cause of the network disruption within the Hazelcast cluster. Aside from this analysis, the team is planning to replace Hazelcast with an alternative messaging platform. Enhancements to the monitoring framework are implemented to proactively detect and alert on similar connectivity issues, enabling prompt intervention and minimizing service disruption.

    Unplanned outage for Axway Platform

    Início 9 Eost 2023 da 07:55 UTC · 0m

    OutageMajor incident
    1. 29 Eost 2023 da 16:26 UTCresolved

      During a certificate upgrade, a rogue certificate caused a tremendous increase of the CPU of Axway Platform and other services that were inaccessible.

    Amplify Central EU scheduled maintenance taking longer than initially planned

    Início 17 Genver 2022 da 08:11 UTC · 27m

    OutageCritical incident
    Componentes afetados
    Amplify Engage
    1. 17 Genver 2022 da 08:11 UTCidentified

      The planned upgrade from RDS 9.6 to 13.3 is taking longer than initially expected. The reason is identified and we are working to get Central up and running again ASAP. The estimated time of resolution and full functionality restoration is 35 minutes.

    2. 17 Genver 2022 da 08:38 UTCresolved

      This incident has been resolved.

    Amplify Central US scheduled maintenance taking longer than initially planned

    Início 14 Genver 2022 da 10:08 UTC · 1h 32m

    OutageMajor incident
    Componentes afetados
    Amplify Engage
    1. 14 Genver 2022 da 10:08 UTCinvestigating

      The planned upgrade from RDS 9.6 to 13.3 is taking longer than initially expected. The reason is identified and we are working to get Central up and running again ASAP.

    2. 14 Genver 2022 da 10:09 UTCinvestigating

      We are continuing to investigate this issue.

    3. 14 Genver 2022 da 10:09 UTCidentified

      The issue has been identified and a fix is being implemented.

    4. 14 Genver 2022 da 10:11 UTCmonitoring

      A fix has been successfully implemented and the service is up and running again. We are closely monitoring the situation, however, we don't expect additional outage. A post mortem analysis is on the way.

    5. 14 Genver 2022 da 11:40 UTCresolved

      The incident has been resolved.

    Unplanned outage for Amplify Central (U.S) and Unified Catalog (U.S.)

    Início 12 Cʼhwevrer 2021 da 06:30 UTC · 0m

    OutageMajor incident
    1. 12 Cʼhwevrer 2021 da 20:53 UTCresolved

      During the deployment of static I.P. addresses for Amplify Central (as noted at the URL below), our engineers encountered unexpected issues with our DNS service which caused the Amplify Central administration interface and Unified Catalog (U.S. only) to to be unreachable. Our engineers worked to resolve the issue and service was restored after approximately 39 minutes. Notification of Static I.P. addresses: https://status.axway.com/incidents/jmy8d6fzwdlh

    Regression during platform upgrade to 7.0.0

    Início 1 Here 2019 da 03:34 UTC · 0m

    IssuesMinor incident
    Componentes afetados
    Platform Dashboard
    1. 1 Here 2019 da 03:34 UTCresolved

      On Saturday, September 28th, Axway upgraded the access management capabilities of the AMPLIFY Platform in the production environment. During that upgrade, at 10:03 AM PDT, a regression happened which the product team promptly stopped with a hot fix (note: a patch is going in shortly to resolve the problem more permanently). On Monday, September 30th, at 9:40 AM PDT, it was discovered that the regression had caused a few single-user organizations to lose at least part of their data. The same day, at 4:40 AM PDT, all data had been fully restored and the incident had been marked as resolved. Axway will be contacting each one of the organizations affected by this temporary loss of data. Already, we want to apologize to these customers for the inconvenience or disruption that this may have caused. The product team systematically conducts full regression tests before any upgrade; this time, there was an edge case flow that we missed in our testing and that led to that incident in production. We are taking steps to prevent the reoccurrence of a similar situation in the future.