Canada
Slow Performance
il y a 48 jours
View 3 reports
Slow Performance
Slow Performance
Slow Performance
Last checked
BC Hydro is a provincial Crown corporation owned by the government and people of British Columbia, Canada. Their primary goal is to generate and deliver electricity to 95% of the population in B. C., serving over five million people. With such a significant responsibility, BC Hydro has a clear and straightforward mission: to provide customers with reliable, affordable, and clean electricity safely. Their vision is to create a cleaner and more sustainable future for all British Columbians. Guided by their values of safety, customer focus, integrity, respect, teamwork, forward thinking, and inclusivity, BC Hydro aims to power the province in an environmentally and socially responsible manner. Their current five-year strategy, from April 2021 to March 2026, focuses on energizing the province, controlling costs, strengthening resilience and agility, and advancing reconciliation with Indigenous Peoples. BC Hydro also emphasizes corporate information, climate leadership, accountability and reports, strategies, plans and regulation, as well as engaging with their customer research panel. As a Provincial Crown corporation, BC Hydro reports through the Ministry of Energy, Mines, and Low Carbon Innovation and operates under key legislation such as the Clean Energy Act. With a commitment to public ownership and the preservation of heritage resources, BC Hydro ensures the transmission and distribution systems, generation, and storage assets are owned by the public. Stay up to date with BC Hydro's news and tips by subscribing to their eNewsletters and connect with them through their various social media channels.
Experiencing an issue?
Is BC Hydro down?
No current problems
Share your experience to help others stay informed.
No unusual report activity
No reports in the last 30 minutes.
Community reportsPast report-based status observations, not measured service uptime.
Uptimus analyse les signalements récents et leur niveau habituel pour détecter une activité inhabituelle affectant BC Hydro.
Uptimus est un service indépendant sans affiliation avec BC Hydro. Un état normal ne garantit pas que chaque utilisateur, appareil ou région soit épargné.
L'état affiché repose sur les signalements récents et les signaux disponibles comparés au niveau habituel.
Uptimus regroupe les signaux pertinents pour identifier les problèmes récurrents de disponibilité, connexion, performance et connectivité.
Questions et réponses courantes
Non, BC Hydro est actuellement opérationnel.
Uptimus analyse les signalements récents et leur niveau habituel pour détecter une activité inhabituelle affectant BC Hydro. L'état affiché repose sur les signalements récents et les signaux disponibles comparés au niveau habituel.
Ajoutez BC Hydro depuis votre espace Uptimus ou l’application mobile pour recevoir des alertes par e-mail, push ou webhook.
La dernière BC Hydro panne s'est produite le 21 juillet 2026, durant 15 minutes. L'incident a été classé comme élevée gravité.
Both services use community reports to highlight possible disruptions. Uptimus adds a unified workspace, localized context, public discussion and alerting across five service types.
| Comparison criteria | Uptimus | Downdetector |
|---|---|---|
| Community outage reports for BC Hydro |
Recent reports do not indicate current problems with BC Hydro. This assessment is based on report activity, not an official provider confirmation. 0 reports were recorded for BC Hydro in the last 24 hours. Report activity assessed: .
| Included |
| Adaptive baseline that separates isolated reports from wider disruption | Included | Included |
|---|
| 24-hour report activity and regional outage view | Included | Included |
|---|
| One workspace for websites, provider status pages, Steam games and Android apps and games | Included | Separate product |
|---|
| Email, push and webhook alerts from the same workspace | Included | Separate product |
|---|
| Public discussion, ratings and incident context on one page | Included | Limited on public pages |
|---|
| One normalized status model shared across all five service types | Included | Separate product |
|---|
Rate this service
No reviews yet
0 outage reports in the last 24 hours.
30 reports loaded
Similar reports from the same location are grouped in 5-minute windows. Counts reflect the reports shown.
Partagez vos réflexions sur BC Hydro
Official incidents, early warnings and community reports are identified separately. Early warning history covers only the last 24 hours. Dates use your time zone.
| Incident name | Duration | StartedUTC | Acknowledged | Severity |
|---|---|---|---|---|
| 16m | Not available | Major |