Coreweave is experiencing an outage
Official provider statusOfficial maintenance active
Scheduled Critical CoreWeave Cloud Maintenance - All Regions — October 23, 2026 9:44PM UTC Scheduled - CoreWeave will be performing critical maintenance on Monday, October 26, 2026 from 20:30 UTC to 21:30 UTC that will affect the CoreWeave VPC API. During this window, we will renew a security certificate used by this service. Location: All regions Impact: During this window, requests to get or update a VPC may intermittently fail for up to 10 minutes. Retrying the request should resolve this. Creating and listing VPCs are not affected. Running workloads, nodes, storage, and networking are not affected, and no data loss is expected. No action is required on your side. We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] October 26, 2026 8:36PM UTC Active - The scheduled critical maintenance on the CoreWeave VPC API has started. We are now renewing a security certificate used by this service. Until the work is complete, requests to get or update a VPC may intermittently fail for up to 10 minutes; retrying the request should resolve this. Creating and listing VPCs, running workloads, nodes, storage, and networking are not affected. We will post an update when the maintenance is complete. October 26, 2026 9:26PM UTC Completed - The scheduled critical maintenance on the CoreWeave VPC API is complete. The security certificate has been renewed, and the service is operating normally. Some requests to get or update a VPC may have failed intermittently during the maintenance; these requests can be retried now. No further action is required on your side. If you have any questions, please contact our support team at [email protected].
Official provider statusOfficial maintenance active
Scheduled Network Maintenance: Switch Firmware Update (Multiple Availability Zones) — October 13, 2026 8:55PM UTC Scheduled - Details: CoreWeave will be performing network maintenance from Monday, October 19, 2026 at 12:00 UTC to Friday, October 23, 2026 at 00:00 UTC. Work runs during daytime hours each day in the window, 12:00 UTC to 00:00 UTC. We are applying a vendor-recommended firmware update to the boot drives of network switches in the following availability zones: US-CENTRAL-09A, US-CENTRAL-08A, US-EAST-04B, US-CENTRAL-10A, US-EAST-12A, US-CENTRAL-08B This update resolves a known issue that can cause a switch to become unresponsive, and it improves overall network reliability. Impact: No impact is expected. The update is applied live, without switch reboots or node drains, and running workloads can continue without interruption. In rare cases, a switch may need a brief restart after the update. Where this affects backend (GPU-to-GPU) network switches, a small number of nodes may temporarily lose part of their backend network bandwidth until the restart completes, which may affect multi-node jobs running on those nodes. Engineers and on-site technicians will be monitoring throughout the window, and affected customers will be contacted directly. No customer action is required. October 19, 2026 4:21AM UTC Active - Scheduled maintenance October 22, 2026 10:48PM UTC Active - This maintenance has been extended through Friday, October 23. October 26, 2026 4:51PM UTC Completed - Maintenance is done
Official provider statusOfficial incident active
Facility power incident impacting services in US-EAST-15A — October 22, 2026 9:32PM UTC Identified - Hello, We are actively investigating a facility power event in US-EAST-15A following the loss of both utility power feeds at the site. Customers in this region may experience compute unavailability, job interruptions, , Inference disruptions and degraded or unavailable Object Storage. Our engineering and facilities teams are actively working to restore stable power and cooling. Impact may continue or widen until site conditions stabilize. If you are impacted or have questions, please contact [email protected]. We apologize for the disruption and thank you for your patience. Thank you, CoreWeave Support October 23, 2026 12:05AM UTC Monitoring - The disruption has been traced to a tripped main feed from the local utility provider, who is actively troubleshooting on site. The facility is running on backup generator power, cooling has been restored, and room temperatures are returning to normal. When utility power gets restored, we will begin bringing systems back online in stages, prioritizing restoring customer capacity. A subset of racks sustained a cooling related hardware issue during the event and require servicing before they can be powered back on; we currently estimate these will be restored by Friday morning. We expect more information on the utility power timeline within the next hour and will post more updates October 23, 2026 3:06AM UTC Monitoring - Power has been restored and node recovery is underway. Nodes are being brought back online in phases, starting with air cooled systems; B200 (liquid cooled) nodes will follow once that first phase completes. We expect full recovery by Morning time due to the subset of racks which sustained a cooling issue during the event and require servicing before they can be powered back on. We'll share more updates as more nodes return to service. October 23, 2026 9:05PM UTC Monitoring - Most capacity in US-EAST-15A has been restored following the facility power event. Power is stable, and we are not expecting a repeat of the utility disruption. A subset of racks still requires follow-on facility work (including coolant servicing) before they can be safely returned to service. Recovered capacity remains available for use while that work continues. We will keep this incident in Monitoring until remaining facility recovery is complete, and will post another update when that work wraps up or if the situation changes. Thank you, CoreWeave Support October 25, 2026 12:43AM UTC Investigating - We are investigating a renewed cooling disruption at the US-EAST-15A facility, with additional racks shutting down and customer impact observed. Customers in this region may experience compute unavailability, job interruptions, and inference disruptions. Our engineering and facilities teams are working with the facility provider to determine the cause and restore stable cooling. Impact may continue or widen until site conditions stabilize. If you are impacted or have questions, please contact [email protected]. We apologize for the renewed disruption and thank you for your patience. Thank you, CoreWeave Support October 25, 2026 2:06AM UTC Investigating - Our facility provider has confirmed a renewed loss of utility power at US-EAST-15A, and the site is currently running on backup generators. The utility provider is investigating the power loss, while the facility's cooling specialists are on site investigating the cooling disruption. We apologize for the continued disruption and thank you for your patience. If you are impacted or need assistance, please contact [email protected]. Thank you, CoreWeave Support October 26, 2026 4:27AM UTC Monitoring - Power has been restored at US-EAST-15A, and we're working to stabilize the site. Most affected nodes are back in service, and we're bringing the remaining nodes back online. We'll continue to monitor the site and share updates as recovery progresses.
Official provider statusOfficial incident active
Storage Incident — October 5, 2026 5:48AM UTC Investigating - Hello, We are actively investigating a storage issue that may be impacting our storage services. As the situation evolves, we will continue to update our customers on the matter. If you have any questions, we encourage you to reach out to support by email: [email protected] We apologize for any inconvenience this may cause and thank you for your patience while we work to resolve the matter in a timely manner. Thank you, CoreWeave Support
Official provider status0 înregistrări individuale în ultimele 24 de ore. Lista include importuri istorice; totalurile agregate ale sursei sunt afișate în grafic.
Observații ale statusului oficial, nu măsurători directe ale disponibilității.
| Numele componentei | Stare |
|---|---|
| Status CoreWeave Cloud - US-ORD1 | Funcțional |
| Status CoreWeave Cloud - US-LAS1 | Funcțional |
| Status CoreWeave Cloud - US-LGA1 | Funcțional |
| Status CoreWeave Cloud - US-RNO2 | Funcțional |
| Status CoreWeave Cloud - CA-EAST-01 | Funcțional |
| Status CoreWeave Cloud - US-CENTRAL-01 | Funcțional |
| Status CoreWeave Cloud - US-CENTRAL-02 | Funcțional |
| Status CoreWeave Cloud - US-CENTRAL-06 | Funcțional |
| Status CoreWeave Cloud - US-CENTRAL-07 | Funcțional |
| Status CoreWeave Cloud - US-CENTRAL-08A | Funcțional |
Incidentele oficiale, semnalele timpurii și rapoartele comunitare sunt identificate separat. Semnalele timpurii acoperă doar ultimele 24 de ore. Datele folosesc fusul tău orar.
| Incident | Durată | ÎnceputUTC | Confirmare oficială | Severitate |
|---|---|---|---|---|
| 48h 4mÎn desfășurare | Da | Major | ||
| 0m | Da | Major | ||
| 0m | Da | Minor | ||
| 0m | Da | Major | ||
| 0m | Da | Minor | ||
| 550h 42mÎn desfășurare | Da | Minor | ||
| 0m | Da | Minor | ||
| 0m | Da | Minor |
Uptimus monitorizează Coreweave prin sursa oficială de status și normalizează incidentele, ferestrele de mentenanță și starea componentelor într-un status unitar.
Această pagină include în prezent 375 componente monitorizate, 54 incidente indexate, 32 ferestre de mentenanță și 45 zile de istoric cunoscut.
Uptimus este un serviciu independent și nu este afiliat cu Coreweave. Un status sănătos nu garantează că fiecare utilizator, dispozitiv sau regiune este neafectată.
Primești notificări când Coreweave sau una dintre componentele monitorizate raportează o întrerupere majoră ori o problemă critică. Alertele pot fi trimise prin canalele activate în workspace, inclusiv email, push și integrările configurate. Istoricul disponibil conține 54 incidente indexate, oferind fiecărei alerte context dincolo de statusul actual. Un incident recent indexat a fost „Facility power incident impacting services in US-EAST-15A”.
Primești alerte despre performanță degradată, impact parțial și incidente mai mici care nu reprezintă o întrerupere completă. Uptimus monitorizează în prezent 375 componente Coreweave: CoreWeave Cloud - US-ORD1, CoreWeave Cloud - US-LAS1, CoreWeave Cloud - US-LGA1, CoreWeave Cloud - US-RNO2. Alertele pot fi trimise prin canalele activate în workspace, inclusiv email, push și integrările configurate.
Planned work published by the official provider.
October 23, 2026 9:44PM UTC Scheduled - CoreWeave will be performing critical maintenance on Monday, October 26, 2026 from 20:30 UTC to 21:30 UTC that will affect the CoreWeave VPC API. During this window, we will renew a security certificate used by this service. Location: All regions Impact: During this window, requests to get or update a VPC may intermittently fail for up to 10 minutes. Retrying the request should resolve this. Creating and listing VPCs are not affected. Running workloads, nodes, storage, and networking are not affected, and no data loss is expected. No action is required on your side. We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] October 26, 2026 8:36PM UTC Active - The scheduled critical maintenance on the CoreWeave VPC API has started. We are now renewing a security certificate used by this service. Until the work is complete, requests to get or update a VPC may intermittently fail for up to 10 minutes; retrying the request should resolve this. Creating and listing VPCs, running workloads, nodes, storage, and networking are not affected. We will post an update when the maintenance is complete. October 26, 2026 9:26PM UTC Completed - The scheduled critical maintenance on the CoreWeave VPC API is complete. The security certificate has been renewed, and the service is operating normally. Some requests to get or update a VPC may have failed intermittently during the maintenance; these requests can be retried now. No further action is required on your side. If you have any questions, please contact our support team at [email protected].
Started 26 oct. 2026, 21:26 UTC · Ongoing
October 13, 2026 8:55PM UTC Scheduled - Details: CoreWeave will be performing network maintenance from Monday, October 19, 2026 at 12:00 UTC to Friday, October 23, 2026 at 00:00 UTC. Work runs during daytime hours each day in the window, 12:00 UTC to 00:00 UTC. We are applying a vendor-recommended firmware update to the boot drives of network switches in the following availability zones: US-CENTRAL-09A, US-CENTRAL-08A, US-EAST-04B, US-CENTRAL-10A, US-EAST-12A, US-CENTRAL-08B This update resolves a known issue that can cause a switch to become unresponsive, and it improves overall network reliability. Impact: No impact is expected. The update is applied live, without switch reboots or node drains, and running workloads can continue without interruption. In rare cases, a switch may need a brief restart after the update. Where this affects backend (GPU-to-GPU) network switches, a small number of nodes may temporarily lose part of their backend network bandwidth until the restart completes, which may affect multi-node jobs running on those nodes. Engineers and on-site technicians will be monitoring throughout the window, and affected customers will be contacted directly. No customer action is required. October 19, 2026 4:21AM UTC Active - Scheduled maintenance October 22, 2026 10:48PM UTC Active - This maintenance has been extended through Friday, October 23. October 26, 2026 4:51PM UTC Completed - Maintenance is done
Started 26 oct. 2026, 16:51 UTC · Ongoing
October 15, 2026 3:19AM UTC Scheduled - Details: CoreWeave will perform scheduled power infrastructure maintenance in CA-East-01A between 26 October 2026 at 11:30 UTC and 29 October 2026 at 01:00 UTC. Work will occur in separate maintenance periods within this overall window. Location: CA-East-01A Scope: Install permanent power quality meters and branch circuit monitoring, and complete associated corrective work on Optistax power distribution unit 11C and 11D. Each unit will be isolated individually for up to two days, including overnight isolation where required. Power will be restored and equipment validated before work begins on the next unit. Impact: No customer service interruption or disruption to CDU operation is expected. Equipment supplied by the unit under maintenance will temporarily operate on its remaining redundant power sources. Power redundancy will be reduced during each isolation period and restored after that unit’s work is complete. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 26, 2026 11:30AM UTC Active - Scheduled Power Infrastructure Maintenance has Started.
Started 26 oct. 2026, 11:30 UTC · Ongoing
October 15, 2026 7:16PM UTC Scheduled - CoreWeave will perform scheduled power infrastructure maintenance in EU-SOUTH-03 region between October 21, 2026 at 06:00 UTC and October 22, 2026 at 08:00 UTC. Work will occur in two separate maintenance periods: October 21 from 06:00–16:00 UTC and October 22 from 06:00–08:00 UTC. Location: EU-SOUTH-03 The work will test backup power systems to verify they can maintain power during an interruption to the electricity supply from the utility grid. During testing, backup generators will supply power to the affected systems before the utility supply is restored. Utility power can also be restored during the test if needed. Impact: No impact to compute, storage, or network availability is expected, and no customer action is required. Power redundancy will be temporarily reduced while the utility supply is disconnected for testing. Customer workloads are expected to remain available throughout the maintenance. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the [CoreWeave Terms of Service Maintenance Policy](https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 21, 2026 4:14PM UTC Active - EU-SOUTH-03 power infrastructure maintenance - first maintenance period completed. The first phase of scheduled power infrastructure maintenance in EU-SOUTH-03 was completed on October 21, 2026 with no issues reported. No testing is currently underway. Work will resume during the second scheduled maintenance period on October 22, 2026, from 06:00 to 08:00 UTC. No customer impact is expected during the remaining work, and no customer action is required. We will provide a further update and confirm when all work is complete. October 23, 2026 4:51PM UTC Completed - Scheduled maintenance is complete. The scheduled second phase of power infrastructure maintenance was completed successfully on October 22, 2026, within the announced maintenance window. Both scheduled maintenance periods are complete.
Started 23 oct. 2026, 16:51 UTC · Ongoing
October 21, 2026 4:19PM UTC Scheduled - CoreWeave will be performing network maintenance on Friday, October 23, 2026, from 01:00 UTC to 04:00 UTC (Thursday, October 22, 9:00 PM–midnight Eastern Time), affecting an InfiniBand network switch and connected GPU nodes. October 23, 2026 1:00AM UTC Active - Scheduled maintenance is starting. October 23, 2026 4:00AM UTC Completed - Scheduled maintenance is ending.
Started 23 oct. 2026, 04:00 UTC · Ongoing
October 9, 2026 12:54AM UTC Scheduled - CoreWeave will perform scheduled maintenance to update CNI networking in CoreWeave-managed clusters in US-EAST-04 beginning Monday, October 19, 2026, at 9:00 AM ET (1:00 PM UTC) and continuing through Friday, October 30, 2026, at 5:00 PM ET (9:00 PM UTC). Location: US-EAST-04 We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy ( https://docs.coreweave.com/policies/terms-of-service/maintenance-policy ) October 19, 2026 1:00PM UTC Active - This maintenance has started.
Started 19 oct. 2026, 13:00 UTC · Ongoing
October 2, 2026 2:02PM UTC Scheduled - CoreWeave will perform scheduled maintenance to update CNI networking in CoreWeave-managed clusters in US-EAST-01A, beginning Monday, October 5, 2026, at 9:00 AM ET (1:00 PM UTC) and continuing through Friday, October 16, 2026, at 5:00 PM ET (9:00 PM UTC). Location: US-EAST-01A We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy ( https://docs.coreweave.com/policies/terms-of-service/maintenance-policy ) October 5, 2026 1:00PM UTC Active - This maintenance has started. October 16, 2026 9:00PM UTC Completed - This maintenance is complete.
Started 16 oct. 2026, 21:00 UTC · Ongoing
October 15, 2026 3:15AM UTC Scheduled - Details: CoreWeave will perform scheduled power infrastructure maintenance in CA-East-01A between 15 October 2026 at 11:30 UTC and 16 October 2026 at 01:00 UTC. Work will occur in separate maintenance periods within this overall window. Location: CA-East-01A Scope: Install permanent power quality meters and branch circuit monitoring, and complete associated corrective work on Optistax power distribution unit 11B. Each unit will be isolated individually for up to two days, including overnight isolation where required. Power will be restored and equipment validated before work begins on the next unit. Impact: No customer service interruption or disruption to CDU operation is expected. Equipment supplied by the unit under maintenance will temporarily operate on its remaining redundant power sources. Power redundancy will be reduced during each isolation period and restored after that unit’s work is complete. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 15, 2026 11:30AM UTC Active - Scheduled Infrastructure Power Maintenance is Starting October 16, 2026 12:01AM UTC Completed - Scheduled Infrastructure Power Maintenance has ended
Started 16 oct. 2026, 00:01 UTC · Ongoing
Paginile publice Downdetector se bazează în principal pe rapoartele utilizatorilor. Uptimus combină activitatea comunității cu incidentele oficiale, ferestrele de mentenanță și starea componentelor atunci când sursa le publică.
| Criterii de comparație | Uptimus | Downdetector |
|---|---|---|
| Rapoarte comunitare despre problemele Coreweave | Inclus | Inclus |
| Baseline adaptiv care separă rapoartele izolate de o întrerupere extinsă | Inclus | Inclus |
| Activitatea rapoartelor din 24 de ore și harta regională | Inclus | Inclus |
| Un singur spațiu pentru website-uri, provideri de status, jocuri Steam și aplicații sau jocuri Android | Inclus | Produs separat |
| Alerte prin e-mail, push și webhook din același spațiu de lucru | Inclus | Produs separat |
| Actualizări oficiale ale incidentelor și cronologia statusului Coreweave | Inclus | Bazat pe rapoarte |
| Starea componentelor și ferestrele de mentenanță păstrate separat | Inclus | Limitat pe paginile publice |
Pagina oficială de status pentru Coreweave raportează o întrerupere. Incident oficial încă nerezolvat: „Facility power incident impacting services in US-EAST-15A”. Nu a fost înregistrat niciun raport despre Coreweave în ultimele 24 de ore. Ultima verificare oficială: .
Evaluează acest serviciu
Încă nu există evaluări
Descoperă alte servicii populare și starea lor actuală
Împărtășește-ți gândurile despre Coreweave
Fii primul care comentează!