    Last checked 10月28日 UTC 04:24

    Coreweave status

    AI hyperscaling for compute resources and machine learning projects.

    Experiencing an issue?

    Coreweave logo

    Coreweave宕机了吗?

    Major outage

    Having issues with Coreweave?

    Share your experience to help others stay informed.

    Current statusHealth graphOutage reportsOutage mapSocial signalsStatus historyComponentsIncident historyMaintenanceCommunityReviewsAboutFAQsMonitor serviceSimilar servicesComparison

    Latest activity

    Last 24 hours
    1. Official status checked

      Coreweave is experiencing an outage

      Official provider status
      10月28日 UTC 04:24
    2. Official maintenance active

      Scheduled Critical CoreWeave Cloud Maintenance - All Regions — October 23, 2026 9:44PM UTC Scheduled - CoreWeave will be performing critical maintenance on Monday, October 26, 2026 from 20:30 UTC to 21:30 UTC that will affect the CoreWeave VPC API. During this window, we will renew a security certificate used by this service. Location: All regions Impact: During this window, requests to get or update a VPC may intermittently fail for up to 10 minutes. Retrying the request should resolve this. Creating and listing VPCs are not affected. Running workloads, nodes, storage, and networking are not affected, and no data loss is expected. No action is required on your side. We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] October 26, 2026 8:36PM UTC Active - The scheduled critical maintenance on the CoreWeave VPC API has started. We are now renewing a security certificate used by this service. Until the work is complete, requests to get or update a VPC may intermittently fail for up to 10 minutes; retrying the request should resolve this. Creating and listing VPCs, running workloads, nodes, storage, and networking are not affected. We will post an update when the maintenance is complete. October 26, 2026 9:26PM UTC Completed - The scheduled critical maintenance on the CoreWeave VPC API is complete. The security certificate has been renewed, and the service is operating normally. Some requests to get or update a VPC may have failed intermittently during the maintenance; these requests can be retried now. No further action is required on your side. If you have any questions, please contact our support team at [email protected].

      Official provider status
      10月26日 UTC 21:26
    3. Official maintenance active

      Scheduled Network Maintenance: Switch Firmware Update (Multiple Availability Zones) — October 13, 2026 8:55PM UTC Scheduled - Details: CoreWeave will be performing network maintenance from Monday, October 19, 2026 at 12:00 UTC to Friday, October 23, 2026 at 00:00 UTC. Work runs during daytime hours each day in the window, 12:00 UTC to 00:00 UTC. We are applying a vendor-recommended firmware update to the boot drives of network switches in the following availability zones: US-CENTRAL-09A, US-CENTRAL-08A, US-EAST-04B, US-CENTRAL-10A, US-EAST-12A, US-CENTRAL-08B This update resolves a known issue that can cause a switch to become unresponsive, and it improves overall network reliability. Impact: No impact is expected. The update is applied live, without switch reboots or node drains, and running workloads can continue without interruption. In rare cases, a switch may need a brief restart after the update. Where this affects backend (GPU-to-GPU) network switches, a small number of nodes may temporarily lose part of their backend network bandwidth until the restart completes, which may affect multi-node jobs running on those nodes. Engineers and on-site technicians will be monitoring throughout the window, and affected customers will be contacted directly. No customer action is required. October 19, 2026 4:21AM UTC Active - Scheduled maintenance October 22, 2026 10:48PM UTC Active - This maintenance has been extended through Friday, October 23. October 26, 2026 4:51PM UTC Completed - Maintenance is done

      Official provider status
      10月26日 UTC 16:51
    4. Official incident active

      Facility power incident impacting services in US-EAST-15A — October 22, 2026 9:32PM UTC Identified - Hello, We are actively investigating a facility power event in US-EAST-15A following the loss of both utility power feeds at the site. Customers in this region may experience compute unavailability, job interruptions, , Inference disruptions and degraded or unavailable Object Storage. Our engineering and facilities teams are actively working to restore stable power and cooling. Impact may continue or widen until site conditions stabilize. If you are impacted or have questions, please contact [email protected]. We apologize for the disruption and thank you for your patience. Thank you, CoreWeave Support October 23, 2026 12:05AM UTC Monitoring - The disruption has been traced to a tripped main feed from the local utility provider, who is actively troubleshooting on site. The facility is running on backup generator power, cooling has been restored, and room temperatures are returning to normal. When utility power gets restored, we will begin bringing systems back online in stages, prioritizing restoring customer capacity. A subset of racks sustained a cooling related hardware issue during the event and require servicing before they can be powered back on; we currently estimate these will be restored by Friday morning. We expect more information on the utility power timeline within the next hour and will post more updates October 23, 2026 3:06AM UTC Monitoring - Power has been restored and node recovery is underway. Nodes are being brought back online in phases, starting with air cooled systems; B200 (liquid cooled) nodes will follow once that first phase completes. We expect full recovery by Morning time due to the subset of racks which sustained a cooling issue during the event and require servicing before they can be powered back on. We'll share more updates as more nodes return to service. October 23, 2026 9:05PM UTC Monitoring - Most capacity in US-EAST-15A has been restored following the facility power event. Power is stable, and we are not expecting a repeat of the utility disruption. A subset of racks still requires follow-on facility work (including coolant servicing) before they can be safely returned to service. Recovered capacity remains available for use while that work continues. We will keep this incident in Monitoring until remaining facility recovery is complete, and will post another update when that work wraps up or if the situation changes. Thank you, CoreWeave Support October 25, 2026 12:43AM UTC Investigating - We are investigating a renewed cooling disruption at the US-EAST-15A facility, with additional racks shutting down and customer impact observed. Customers in this region may experience compute unavailability, job interruptions, and inference disruptions. Our engineering and facilities teams are working with the facility provider to determine the cause and restore stable cooling. Impact may continue or widen until site conditions stabilize. If you are impacted or have questions, please contact [email protected]. We apologize for the renewed disruption and thank you for your patience. Thank you, CoreWeave Support October 25, 2026 2:06AM UTC Investigating - Our facility provider has confirmed a renewed loss of utility power at US-EAST-15A, and the site is currently running on backup generators. The utility provider is investigating the power loss, while the facility's cooling specialists are on site investigating the cooling disruption. We apologize for the continued disruption and thank you for your patience. If you are impacted or need assistance, please contact [email protected]. Thank you, CoreWeave Support October 26, 2026 4:27AM UTC Monitoring - Power has been restored at US-EAST-15A, and we're working to stabilize the site. Most affected nodes are back in service, and we're bringing the remaining nodes back online. We'll continue to monitor the site and share updates as recovery progresses.

      Official provider status
      10月26日 UTC 04:27
    5. Official incident active

      Storage Incident — October 5, 2026 5:48AM UTC Investigating - Hello, We are actively investigating a storage issue that may be impacting our storage services. As the situation evolves, we will continue to update our customers on the matter. If you have any questions, we encourage you to reach out to support by email: [email protected] We apologize for any inconvenience this may cause and thank you for your patience while we work to resolve the matter in a timely manner. Thank you, CoreWeave Support

      Official provider status
      10月5日 UTC 05:48

    Coreweave outage reports

    0 individual report entries in the last 24 hours. This list includes legacy imports; external source aggregates are shown in the chart.

    近期没有中断报告

    过去24小时内,社区没有提交此服务的中断报告。

    在 Coreweave 状态发生变化时接收通知

    通过电子邮件、推送和 Webhook 通知。

    开始监控

    Coreweave 中断地图

    Approved reports from the last 24 hours, grouped by country. Markers show country-level locations, not precise locations or confirmed affected infrastructure.
    查看完整地图

    Coreweave 中断地图

    Loading report locations…

    Coreweave status history

    Official status observations, not measured service uptime.

    Coreweave components

    Component nameStatus
    CoreWeave Cloud - US-ORD1 statusUp
    CoreWeave Cloud - US-LAS1 statusUp
    CoreWeave Cloud - US-LGA1 statusUp
    CoreWeave Cloud - US-RNO2 statusUp
    CoreWeave Cloud - CA-EAST-01 statusUp
    CoreWeave Cloud - US-CENTRAL-01 statusUp
    CoreWeave Cloud - US-CENTRAL-02 statusUp
    CoreWeave Cloud - US-CENTRAL-06 statusUp
    CoreWeave Cloud - US-CENTRAL-07 statusUp
    CoreWeave Cloud - US-CENTRAL-08A statusUp

    Coreweave incident history

    Official incidents, early warnings and community reports are identified separately. Early warning history covers only the last 24 hours. Dates use your time zone.

    View more history
    Incident nameDurationStartedUTCAcknowledgedSeverity
    Official status·Unresolved47h 59mOngoing2026年10月26日UTC 04:27YesMajor
    Official status·Resolved0m2026年10月13日UTC 22:24YesMajor
    Official status·Resolved0m2026年10月12日UTC 21:13YesMinor
    Official status·Resolved0m2026年10月6日UTC 19:22YesMajor
    Official status·Resolved0m2026年10月5日UTC 12:14YesMinor
    Official status·Unresolved550h 38mOngoing2026年10月5日UTC 05:48YesMinor
    Official status·Resolved0m2026年9月27日UTC 06:38YesMinor
    Official status·Resolved0m2026年9月16日UTC 02:49YesMinor

    关于 Uptimus 对 Coreweave 的监控

    Uptimus 通过官方状态源监控 Coreweave,并将事件、维护和组件健康状况统一为一致的服务状态。

    此页面目前包含 375 个受监控组件、54 个事件、32 个维护窗口和 45 天已知历史。

    Uptimus 是独立监控服务,与 Coreweave 无关联。健康状态并不保证每位用户、设备或地区都未受影响。

    Uptimus 如何监控 Coreweave

    当 Coreweave 或受监控组件报告重大或关键中断时接收通知。 提醒可通过工作区启用的渠道发送,包括电子邮件、推送和已配置的集成。 可用历史包含 54 个事件,为提醒提供当前状态之外的背景。 最近收录的事件是“Facility power incident impacting services in US-EAST-15A”。

    接收有关性能下降、部分影响和非完全中断的小型事件通知。 Uptimus 当前跟踪 Coreweave 的 375 个组件: CoreWeave Cloud - US-ORD1, CoreWeave Cloud - US-LAS1, CoreWeave Cloud - US-LGA1, CoreWeave Cloud - US-RNO2。 提醒可通过工作区启用的渠道发送,包括电子邮件、推送和已配置的集成。

    维护通知
    当 Coreweave 发布计划、预定或正在进行的维护时接收通知。 Uptimus 已从 Coreweave 的可用历史中收录 32 个维护窗口。 提醒可通过工作区启用的渠道发送,包括电子邮件、推送和已配置的集成。
    恢复通知
    当 Coreweave 或受影响组件恢复正常运行时收到通知。 页面包含 45 天已知历史,已解决事件仍可供查看。 提醒可通过工作区启用的渠道发送,包括电子邮件、推送和已配置的集成。

    社区讨论

    分享您对 Coreweave 的看法

    A
    还没有评论

    成为第一个评论的人!

    Scheduled maintenance

    Planned work published by the official provider.

    1. ✓

      Scheduled Critical CoreWeave Cloud Maintenance - All Regions

      Maintenance

      October 23, 2026 9:44PM UTC Scheduled - CoreWeave will be performing critical maintenance on Monday, October 26, 2026 from 20:30 UTC to 21:30 UTC that will affect the CoreWeave VPC API. During this window, we will renew a security certificate used by this service. Location: All regions Impact: During this window, requests to get or update a VPC may intermittently fail for up to 10 minutes. Retrying the request should resolve this. Creating and listing VPCs are not affected. Running workloads, nodes, storage, and networking are not affected, and no data loss is expected. No action is required on your side. We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] October 26, 2026 8:36PM UTC Active - The scheduled critical maintenance on the CoreWeave VPC API has started. We are now renewing a security certificate used by this service. Until the work is complete, requests to get or update a VPC may intermittently fail for up to 10 minutes; retrying the request should resolve this. Creating and listing VPCs, running workloads, nodes, storage, and networking are not affected. We will post an update when the maintenance is complete. October 26, 2026 9:26PM UTC Completed - The scheduled critical maintenance on the CoreWeave VPC API is complete. The security certificate has been renewed, and the service is operating normally. Some requests to get or update a VPC may have failed intermittently during the maintenance; these requests can be retried now. No further action is required on your side. If you have any questions, please contact our support team at [email protected].

      Started 2026年10月26日 UTC 21:26 · Ongoing

    2. ✓

      Scheduled Network Maintenance: Switch Firmware Update (Multiple Availability Zones)

      Maintenance

      October 13, 2026 8:55PM UTC Scheduled - Details: CoreWeave will be performing network maintenance from Monday, October 19, 2026 at 12:00 UTC to Friday, October 23, 2026 at 00:00 UTC. Work runs during daytime hours each day in the window, 12:00 UTC to 00:00 UTC. We are applying a vendor-recommended firmware update to the boot drives of network switches in the following availability zones: US-CENTRAL-09A, US-CENTRAL-08A, US-EAST-04B, US-CENTRAL-10A, US-EAST-12A, US-CENTRAL-08B This update resolves a known issue that can cause a switch to become unresponsive, and it improves overall network reliability. Impact: No impact is expected. The update is applied live, without switch reboots or node drains, and running workloads can continue without interruption. In rare cases, a switch may need a brief restart after the update. Where this affects backend (GPU-to-GPU) network switches, a small number of nodes may temporarily lose part of their backend network bandwidth until the restart completes, which may affect multi-node jobs running on those nodes. Engineers and on-site technicians will be monitoring throughout the window, and affected customers will be contacted directly. No customer action is required. October 19, 2026 4:21AM UTC Active - Scheduled maintenance October 22, 2026 10:48PM UTC Active - This maintenance has been extended through Friday, October 23. October 26, 2026 4:51PM UTC Completed - Maintenance is done

      Started 2026年10月26日 UTC 16:51 · Ongoing

    3. ✓

      Scheduled Power Infrastructure Maintenance - CA-EAST-01A

      Maintenance

      October 15, 2026 3:19AM UTC Scheduled - Details: CoreWeave will perform scheduled power infrastructure maintenance in CA-East-01A between 26 October 2026 at 11:30 UTC and 29 October 2026 at 01:00 UTC. Work will occur in separate maintenance periods within this overall window. Location: CA-East-01A Scope: Install permanent power quality meters and branch circuit monitoring, and complete associated corrective work on Optistax power distribution unit 11C and 11D. Each unit will be isolated individually for up to two days, including overnight isolation where required. Power will be restored and equipment validated before work begins on the next unit. Impact: No customer service interruption or disruption to CDU operation is expected. Equipment supplied by the unit under maintenance will temporarily operate on its remaining redundant power sources. Power redundancy will be reduced during each isolation period and restored after that unit’s work is complete. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 26, 2026 11:30AM UTC Active - Scheduled Power Infrastructure Maintenance has Started.

      Started 2026年10月26日 UTC 11:30 · Ongoing

    4. ✓

      Scheduled Power Infrastructure Maintenance - EU-SOUTH-03

      Maintenance

      October 15, 2026 7:16PM UTC Scheduled - CoreWeave will perform scheduled power infrastructure maintenance in EU-SOUTH-03 region between October 21, 2026 at 06:00 UTC and October 22, 2026 at 08:00 UTC. Work will occur in two separate maintenance periods: October 21 from 06:00–16:00 UTC and October 22 from 06:00–08:00 UTC. Location: EU-SOUTH-03 The work will test backup power systems to verify they can maintain power during an interruption to the electricity supply from the utility grid. During testing, backup generators will supply power to the affected systems before the utility supply is restored. Utility power can also be restored during the test if needed. Impact: No impact to compute, storage, or network availability is expected, and no customer action is required. Power redundancy will be temporarily reduced while the utility supply is disconnected for testing. Customer workloads are expected to remain available throughout the maintenance. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the [CoreWeave Terms of Service Maintenance Policy](https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 21, 2026 4:14PM UTC Active - EU-SOUTH-03 power infrastructure maintenance - first maintenance period completed. The first phase of scheduled power infrastructure maintenance in EU-SOUTH-03 was completed on October 21, 2026 with no issues reported. No testing is currently underway. Work will resume during the second scheduled maintenance period on October 22, 2026, from 06:00 to 08:00 UTC. No customer impact is expected during the remaining work, and no customer action is required. We will provide a further update and confirm when all work is complete. October 23, 2026 4:51PM UTC Completed - Scheduled maintenance is complete. The scheduled second phase of power infrastructure maintenance was completed successfully on October 22, 2026, within the announced maintenance window. Both scheduled maintenance periods are complete.

      Started 2026年10月23日 UTC 16:51 · Ongoing

    5. ✓

      Scheduled CoreWeave Network Maintenance - US-CENTRAL-06A

      Maintenance

      October 21, 2026 4:19PM UTC Scheduled - CoreWeave will be performing network maintenance on Friday, October 23, 2026, from 01:00 UTC to 04:00 UTC (Thursday, October 22, 9:00 PM–midnight Eastern Time), affecting an InfiniBand network switch and connected GPU nodes. October 23, 2026 1:00AM UTC Active - Scheduled maintenance is starting. October 23, 2026 4:00AM UTC Completed - Scheduled maintenance is ending.

      Started 2026年10月23日 UTC 04:00 · Ongoing

    6. ✓

      Scheduled CoreWeave Maintenance - US-EAST-04

      Maintenance

      October 9, 2026 12:54AM UTC Scheduled - CoreWeave will perform scheduled maintenance to update CNI networking in CoreWeave-managed clusters in US-EAST-04 beginning Monday, October 19, 2026, at 9:00 AM ET (1:00 PM UTC) and continuing through Friday, October 30, 2026, at 5:00 PM ET (9:00 PM UTC). Location: US-EAST-04 We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy ( https://docs.coreweave.com/policies/terms-of-service/maintenance-policy ) October 19, 2026 1:00PM UTC Active - This maintenance has started.

      Started 2026年10月19日 UTC 13:00 · Ongoing

    7. ✓

      Scheduled CoreWeave Maintenance - US-EAST-01A

      Maintenance

      October 2, 2026 2:02PM UTC Scheduled - CoreWeave will perform scheduled maintenance to update CNI networking in CoreWeave-managed clusters in US-EAST-01A, beginning Monday, October 5, 2026, at 9:00 AM ET (1:00 PM UTC) and continuing through Friday, October 16, 2026, at 5:00 PM ET (9:00 PM UTC). Location: US-EAST-01A We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy ( https://docs.coreweave.com/policies/terms-of-service/maintenance-policy ) October 5, 2026 1:00PM UTC Active - This maintenance has started. October 16, 2026 9:00PM UTC Completed - This maintenance is complete.

      Started 2026年10月16日 UTC 21:00 · Ongoing

    8. ✓

      Scheduled Power Infrastructure Maintenance - CA-EAST-01A

      Maintenance

      October 15, 2026 3:15AM UTC Scheduled - Details: CoreWeave will perform scheduled power infrastructure maintenance in CA-East-01A between 15 October 2026 at 11:30 UTC and 16 October 2026 at 01:00 UTC. Work will occur in separate maintenance periods within this overall window. Location: CA-East-01A Scope: Install permanent power quality meters and branch circuit monitoring, and complete associated corrective work on Optistax power distribution unit 11B. Each unit will be isolated individually for up to two days, including overnight isolation where required. Power will be restored and equipment validated before work begins on the next unit. Impact: No customer service interruption or disruption to CDU operation is expected. Equipment supplied by the unit under maintenance will temporarily operate on its remaining redundant power sources. Power redundancy will be reduced during each isolation period and restored after that unit’s work is complete. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 15, 2026 11:30AM UTC Active - Scheduled Infrastructure Power Maintenance is Starting October 16, 2026 12:01AM UTC Completed - Scheduled Infrastructure Power Maintenance has ended

      Started 2026年10月16日 UTC 00:01 · Ongoing

    状态消息
    Uptimus 保存 Coreweave 发布的事件标题,并与标准化状态一起显示。 可用历史包含 54 个事件,为提醒提供当前状态之外的背景。 最近收录的事件是“Facility power incident impacting services in US-EAST-15A”。
    状态详情
    事件和维护更新会被保留,以便跟踪调查、缓解和恢复过程。 Uptimus 保存的近期官方更新为:“October 22, 2026 9:32PM UTC Identified - Hello, We are actively investigating a facility power event in US-EAST-15A following the loss of both utility power feeds at the site. Customers in this region may experience compute unavailability, job interruptions…”。
    组件状态筛选
    选择所有组件或仅选择使用的 Coreweave 产品。官方通知会遵循该选择。 Uptimus 当前跟踪 Coreweave 的 375 个组件: CoreWeave Cloud - US-ORD1, CoreWeave Cloud - US-LAS1, CoreWeave Cloud - US-LGA1, CoreWeave Cloud - US-RNO2。 筛选只改变官方提醒的发送范围,不会从公开历史中移除事件。

    常见问题

    在 Coreweave 状态发生变化时接收通知

    开始监控
    Similar services
    Comparison

    Coreweave:Uptimus 与 Downdetector 对比

    Downdetector 公共页面主要基于用户报告。Uptimus 还会在来源提供时结合官方事件、维护窗口和组件状态。

    Coreweave:Uptimus 与 Downdetector 对比
    比较标准UptimusDowndetector
    Coreweave 的社区中断报告已包含已包含
    区分个别报告和大范围中断的自适应基线已包含已包含
    24 小时报表活动和区域中断视图已包含已包含
    在一个工作区管理网站、状态提供商、Steam 游戏及 Android 应用和游戏已包含独立产品
    从同一工作区发送邮件、推送和 Webhook 告警已包含独立产品
    Coreweave 的官方事件更新和状态时间线已包含以用户报告为主
    分别展示组件健康与维护窗口已包含公共页面功能有限
    已包含以用户报告为主 · 公共页面功能有限独立产品

    The official status page for Coreweave reports an outage. An unresolved official incident is listed: “Facility power incident impacting services in US-EAST-15A”. 0 reports were recorded for Coreweave in the last 24 hours. Last official check: 10月28日 UTC 04:24.