Last checked
AI hyperscaling for compute resources and machine learning projects.
Experiencing an issue?

Is Coreweave down?
Major outage
Share your experience to help others stay informed.
Official status checked
Coreweave is experiencing an outage
Official provider statusOfficial maintenance active
Scheduled Critical CoreWeave Cloud Maintenance - All Regions — October 23, 2026 9:44PM UTC Scheduled - CoreWeave will be performing critical maintenance on Monday, October 26, 2026 from 20:30 UTC to 21:30 UTC that will affect the CoreWeave VPC API. During this window, we will renew a security certificate used by this service. Location: All regions Impact: During this window, requests to get or update a VPC may intermittently fail for up to 10 minutes. Retrying the request should resolve this. Creating and listing VPCs are not affected. Running workloads, nodes, storage, and networking are not affected, and no data loss is expected. No action is required on your side. We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] October 26, 2026 8:36PM UTC Active - The scheduled critical maintenance on the CoreWeave VPC API has started. We are now renewing a security certificate used by this service. Until the work is complete, requests to get or update a VPC may intermittently fail for up to 10 minutes; retrying the request should resolve this. Creating and listing VPCs, running workloads, nodes, storage, and networking are not affected. We will post an update when the maintenance is complete.
Official provider statusOfficial maintenance active
Scheduled Network Maintenance: Switch Firmware Update (Multiple Availability Zones) — October 13, 2026 8:55PM UTC Scheduled - Details: CoreWeave will be performing network maintenance from Monday, October 19, 2026 at 12:00 UTC to Friday, October 23, 2026 at 00:00 UTC. Work runs during daytime hours each day in the window, 12:00 UTC to 00:00 UTC. We are applying a vendor-recommended firmware update to the boot drives of network switches in the following availability zones: US-CENTRAL-09A, US-CENTRAL-08A, US-EAST-04B, US-CENTRAL-10A, US-EAST-12A, US-CENTRAL-08B This update resolves a known issue that can cause a switch to become unresponsive, and it improves overall network reliability. Impact: No impact is expected. The update is applied live, without switch reboots or node drains, and running workloads can continue without interruption. In rare cases, a switch may need a brief restart after the update. Where this affects backend (GPU-to-GPU) network switches, a small number of nodes may temporarily lose part of their backend network bandwidth until the restart completes, which may affect multi-node jobs running on those nodes. Engineers and on-site technicians will be monitoring throughout the window, and affected customers will be contacted directly. No customer action is required. October 19, 2026 4:21AM UTC Active - Scheduled maintenance October 22, 2026 10:48PM UTC Active - This maintenance has been extended through Friday, October 23. October 26, 2026 4:51PM UTC Completed - Maintenance is done
Official provider statusOfficial incident active
Facility power incident impacting services in US-EAST-15A — October 22, 2026 9:32PM UTC Identified - Hello, We are actively investigating a facility power event in US-EAST-15A following the loss of both utility power feeds at the site. Customers in this region may experience compute unavailability, job interruptions, , Inference disruptions and degraded or unavailable Object Storage. Our engineering and facilities teams are actively working to restore stable power and cooling. Impact may continue or widen until site conditions stabilize. If you are impacted or have questions, please contact [email protected]. We apologize for the disruption and thank you for your patience. Thank you, CoreWeave Support October 23, 2026 12:05AM UTC Monitoring - The disruption has been traced to a tripped main feed from the local utility provider, who is actively troubleshooting on site. The facility is running on backup generator power, cooling has been restored, and room temperatures are returning to normal. When utility power gets restored, we will begin bringing systems back online in stages, prioritizing restoring customer capacity. A subset of racks sustained a cooling related hardware issue during the event and require servicing before they can be powered back on; we currently estimate these will be restored by Friday morning. We expect more information on the utility power timeline within the next hour and will post more updates October 23, 2026 3:06AM UTC Monitoring - Power has been restored and node recovery is underway. Nodes are being brought back online in phases, starting with air cooled systems; B200 (liquid cooled) nodes will follow once that first phase completes. We expect full recovery by Morning time due to the subset of racks which sustained a cooling issue during the event and require servicing before they can be powered back on. We'll share more updates as more nodes return to service. October 23, 2026 9:05PM UTC Monitoring - Most capacity in US-EAST-15A has been restored following the facility power event. Power is stable, and we are not expecting a repeat of the utility disruption. A subset of racks still requires follow-on facility work (including coolant servicing) before they can be safely returned to service. Recovered capacity remains available for use while that work continues. We will keep this incident in Monitoring until remaining facility recovery is complete, and will post another update when that work wraps up or if the situation changes. Thank you, CoreWeave Support October 25, 2026 12:43AM UTC Investigating - We are investigating a renewed cooling disruption at the US-EAST-15A facility, with additional racks shutting down and customer impact observed. Customers in this region may experience compute unavailability, job interruptions, and inference disruptions. Our engineering and facilities teams are working with the facility provider to determine the cause and restore stable cooling. Impact may continue or widen until site conditions stabilize. If you are impacted or have questions, please contact [email protected]. We apologize for the renewed disruption and thank you for your patience. Thank you, CoreWeave Support October 25, 2026 2:06AM UTC Investigating - Our facility provider has confirmed a renewed loss of utility power at US-EAST-15A, and the site is currently running on backup generators. The utility provider is investigating the power loss, while the facility's cooling specialists are on site investigating the cooling disruption. We apologize for the continued disruption and thank you for your patience. If you are impacted or need assistance, please contact [email protected]. Thank you, CoreWeave Support October 26, 2026 4:27AM UTC Monitoring - Power has been restored at US-EAST-15A, and we're working to stabilize the site. Most affected nodes are back in service, and we're bringing the remaining nodes back online. We'll continue to monitor the site and share updates as recovery progresses.
Official provider statusOfficial incident active
Storage Incident — October 5, 2026 5:48AM UTC Investigating - Hello, We are actively investigating a storage issue that may be impacting our storage services. As the situation evolves, we will continue to update our customers on the matter. If you have any questions, we encourage you to reach out to support by email: [email protected] We apologize for any inconvenience this may cause and thank you for your patience while we work to resolve the matter in a timely manner. Thank you, CoreWeave Support
Official provider status0 individual report entries in the last 24 hours. This list includes legacy imports; external source aggregates are shown in the chart.
Official status observations, not measured service uptime.
Official incidents, early warnings and community reports are identified separately. Early warning history covers only the last 24 hours. Dates use your time zone.
| Incident name | Duration | StartedUTC | Acknowledged | Severity |
|---|---|---|---|---|
| 19h 23mOngoing | Yes | Major | ||
| 0m | Yes | Major | ||
| 0m | Yes | Minor | ||
| 0m | Yes | Major | ||
| 0m | Yes | Minor | ||
| 522h 2mOngoing | Yes | Minor | ||
| 0m | Yes | Minor | ||
| 0m | Yes | Minor |
Uptimus monitors Coreweave through its official status source and normalizes published incidents, maintenance windows and component health into one consistent service status.
This page currently includes 375 monitored components, 54 indexed incidents, 32 maintenance windows and 46 days of known history.
Uptimus is an independent monitoring service and is not affiliated with Coreweave. A healthy status does not guarantee that every user, device or region is unaffected.
Get notified when Coreweave or one of its monitored components reports a major outage or another critical service disruption. Alerts can be routed through the notification channels enabled for your workspace, including email, push and configured integrations. The available history contains 54 indexed incidents, giving each alert context beyond the current status. A recent indexed incident was “Facility power incident impacting services in US-EAST-15A”.
Get notified about degraded performance, partial impact and smaller incidents that do not represent a complete outage. Uptimus currently tracks 375 Coreweave components: CoreWeave Cloud - US-ORD1, CoreWeave Cloud - US-LAS1, CoreWeave Cloud - US-LGA1, CoreWeave Cloud - US-RNO2. Alerts can be routed through the notification channels enabled for your workspace, including email, push and configured integrations.
Planned work published by the official provider.
October 23, 2026 9:44PM UTC Scheduled - CoreWeave will be performing critical maintenance on Monday, October 26, 2026 from 20:30 UTC to 21:30 UTC that will affect the CoreWeave VPC API. During this window, we will renew a security certificate used by this service. Location: All regions Impact: During this window, requests to get or update a VPC may intermittently fail for up to 10 minutes. Retrying the request should resolve this. Creating and listing VPCs are not affected. Running workloads, nodes, storage, and networking are not affected, and no data loss is expected. No action is required on your side. We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] October 26, 2026 8:36PM UTC Active - The scheduled critical maintenance on the CoreWeave VPC API has started. We are now renewing a security certificate used by this service. Until the work is complete, requests to get or update a VPC may intermittently fail for up to 10 minutes; retrying the request should resolve this. Creating and listing VPCs, running workloads, nodes, storage, and networking are not affected. We will post an update when the maintenance is complete.
Started Oct 26, 2026, 08:36 PM UTC · Ongoing
October 13, 2026 8:55PM UTC Scheduled - Details: CoreWeave will be performing network maintenance from Monday, October 19, 2026 at 12:00 UTC to Friday, October 23, 2026 at 00:00 UTC. Work runs during daytime hours each day in the window, 12:00 UTC to 00:00 UTC. We are applying a vendor-recommended firmware update to the boot drives of network switches in the following availability zones: US-CENTRAL-09A, US-CENTRAL-08A, US-EAST-04B, US-CENTRAL-10A, US-EAST-12A, US-CENTRAL-08B This update resolves a known issue that can cause a switch to become unresponsive, and it improves overall network reliability. Impact: No impact is expected. The update is applied live, without switch reboots or node drains, and running workloads can continue without interruption. In rare cases, a switch may need a brief restart after the update. Where this affects backend (GPU-to-GPU) network switches, a small number of nodes may temporarily lose part of their backend network bandwidth until the restart completes, which may affect multi-node jobs running on those nodes. Engineers and on-site technicians will be monitoring throughout the window, and affected customers will be contacted directly. No customer action is required. October 19, 2026 4:21AM UTC Active - Scheduled maintenance October 22, 2026 10:48PM UTC Active - This maintenance has been extended through Friday, October 23. October 26, 2026 4:51PM UTC Completed - Maintenance is done
Started Oct 26, 2026, 04:51 PM UTC · Ongoing
October 15, 2026 3:19AM UTC Scheduled - Details: CoreWeave will perform scheduled power infrastructure maintenance in CA-East-01A between 26 October 2026 at 11:30 UTC and 29 October 2026 at 01:00 UTC. Work will occur in separate maintenance periods within this overall window. Location: CA-East-01A Scope: Install permanent power quality meters and branch circuit monitoring, and complete associated corrective work on Optistax power distribution unit 11C and 11D. Each unit will be isolated individually for up to two days, including overnight isolation where required. Power will be restored and equipment validated before work begins on the next unit. Impact: No customer service interruption or disruption to CDU operation is expected. Equipment supplied by the unit under maintenance will temporarily operate on its remaining redundant power sources. Power redundancy will be reduced during each isolation period and restored after that unit’s work is complete. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 26, 2026 11:30AM UTC Active - Scheduled Power Infrastructure Maintenance has Started.
Started Oct 26, 2026, 11:30 AM UTC · Ongoing
October 15, 2026 7:16PM UTC Scheduled - CoreWeave will perform scheduled power infrastructure maintenance in EU-SOUTH-03 region between October 21, 2026 at 06:00 UTC and October 22, 2026 at 08:00 UTC. Work will occur in two separate maintenance periods: October 21 from 06:00–16:00 UTC and October 22 from 06:00–08:00 UTC. Location: EU-SOUTH-03 The work will test backup power systems to verify they can maintain power during an interruption to the electricity supply from the utility grid. During testing, backup generators will supply power to the affected systems before the utility supply is restored. Utility power can also be restored during the test if needed. Impact: No impact to compute, storage, or network availability is expected, and no customer action is required. Power redundancy will be temporarily reduced while the utility supply is disconnected for testing. Customer workloads are expected to remain available throughout the maintenance. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the [CoreWeave Terms of Service Maintenance Policy](https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 21, 2026 4:14PM UTC Active - EU-SOUTH-03 power infrastructure maintenance - first maintenance period completed. The first phase of scheduled power infrastructure maintenance in EU-SOUTH-03 was completed on October 21, 2026 with no issues reported. No testing is currently underway. Work will resume during the second scheduled maintenance period on October 22, 2026, from 06:00 to 08:00 UTC. No customer impact is expected during the remaining work, and no customer action is required. We will provide a further update and confirm when all work is complete. October 23, 2026 4:51PM UTC Completed - Scheduled maintenance is complete. The scheduled second phase of power infrastructure maintenance was completed successfully on October 22, 2026, within the announced maintenance window. Both scheduled maintenance periods are complete.
Started Oct 23, 2026, 04:51 PM UTC · Ongoing
October 21, 2026 4:19PM UTC Scheduled - CoreWeave will be performing network maintenance on Friday, October 23, 2026, from 01:00 UTC to 04:00 UTC (Thursday, October 22, 9:00 PM–midnight Eastern Time), affecting an InfiniBand network switch and connected GPU nodes. October 23, 2026 1:00AM UTC Active - Scheduled maintenance is starting. October 23, 2026 4:00AM UTC Completed - Scheduled maintenance is ending.
Started Oct 23, 2026, 04:00 AM UTC · Ongoing
October 9, 2026 12:54AM UTC Scheduled - CoreWeave will perform scheduled maintenance to update CNI networking in CoreWeave-managed clusters in US-EAST-04 beginning Monday, October 19, 2026, at 9:00 AM ET (1:00 PM UTC) and continuing through Friday, October 30, 2026, at 5:00 PM ET (9:00 PM UTC). Location: US-EAST-04 We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy ( https://docs.coreweave.com/policies/terms-of-service/maintenance-policy ) October 19, 2026 1:00PM UTC Active - This maintenance has started.
Started Oct 19, 2026, 01:00 PM UTC · Ongoing
October 2, 2026 2:02PM UTC Scheduled - CoreWeave will perform scheduled maintenance to update CNI networking in CoreWeave-managed clusters in US-EAST-01A, beginning Monday, October 5, 2026, at 9:00 AM ET (1:00 PM UTC) and continuing through Friday, October 16, 2026, at 5:00 PM ET (9:00 PM UTC). Location: US-EAST-01A We will be actively monitoring the situation during this time. We appreciate your patience and understanding. If you have any further questions or require assistance, please don't hesitate to reach out to our support team at [email protected] This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy ( https://docs.coreweave.com/policies/terms-of-service/maintenance-policy ) October 5, 2026 1:00PM UTC Active - This maintenance has started. October 16, 2026 9:00PM UTC Completed - This maintenance is complete.
Started Oct 16, 2026, 09:00 PM UTC · Ongoing
October 15, 2026 3:15AM UTC Scheduled - Details: CoreWeave will perform scheduled power infrastructure maintenance in CA-East-01A between 15 October 2026 at 11:30 UTC and 16 October 2026 at 01:00 UTC. Work will occur in separate maintenance periods within this overall window. Location: CA-East-01A Scope: Install permanent power quality meters and branch circuit monitoring, and complete associated corrective work on Optistax power distribution unit 11B. Each unit will be isolated individually for up to two days, including overnight isolation where required. Power will be restored and equipment validated before work begins on the next unit. Impact: No customer service interruption or disruption to CDU operation is expected. Equipment supplied by the unit under maintenance will temporarily operate on its remaining redundant power sources. Power redundancy will be reduced during each isolation period and restored after that unit’s work is complete. We will actively monitor systems throughout the maintenance. If you have questions or require assistance, please contact our support team at [email protected]. This activity is deemed Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/policies/terms-of-service/maintenance-policy). October 15, 2026 11:30AM UTC Active - Scheduled Infrastructure Power Maintenance is Starting October 16, 2026 12:01AM UTC Completed - Scheduled Infrastructure Power Maintenance has ended
Started Oct 16, 2026, 12:01 AM UTC · Ongoing
Downdetector public pages are led by user reports. Uptimus combines community activity with official provider incidents, maintenance windows and component health when the source publishes them.
| Comparison criteria | Uptimus | Downdetector |
|---|---|---|
| Community outage reports for Coreweave | Included | Included |
| Adaptive baseline that separates isolated reports from wider disruption | Included | Included |
| 24-hour report activity and regional outage view | Included | Included |
| One workspace for websites, provider status pages, Steam games and Android apps and games | Included | Separate product |
| Email, push and webhook alerts from the same workspace | Included | Separate product |
| Official incident updates and status timeline for Coreweave | Included | User-report led |
| Component health and maintenance windows kept separate | Included | Limited on public pages |
The official status page for Coreweave reports an outage. An unresolved official incident is listed: “Facility power incident impacting services in US-EAST-15A”. 0 reports were recorded for Coreweave in the last 24 hours. Last official check: .
Share your thoughts about Coreweave
Be the first to comment!
Rate this service
No reviews yet
Discover other popular services and their current status